LOD 300
LOD 300 Architectural & Structural BIM
Design-development and permit-grade 3D BIM geometry with verified wall assemblies, structural column/beam sizing, and code-compliant egress schedules.
Filter all 35 dedicated 16-section engineering packages instantly by discipline cluster, BIM Level of Development (LOD 300 / 350 / 400), and floor-area scale without page reloads.
LOD 300
Design-development and permit-grade 3D BIM geometry with verified wall assemblies, structural column/beam sizing, and code-compliant egress schedules.
LOD 350
Construction-ready RIBA Stage 4 federated coordination modeling exact structural connections, MEP hangers, slab penetrations, and zero-clash ceiling plenums.
LOD 400
Direct-to-factory digital twins containing bolt/weld assembly marks, MEP prefabrication spool sheets, curtain-wall machining details, and zero-waste cut lists.
LOD 350 / 400
Rule-based Navisworks & Solibri spatial auditing plus active engineering redesign to deliver signed zero-clash construction models.
ISO 19650 EIR / BEP
End-to-end BIM Information Management establishing airtight EIRs, Master Information Delivery Plans (MIDP), naming conventions, and COBie asset schemas.
LOD 300 / 350 (LOA 30)
Converting raw LiDAR laser scans (.E57 / .RCP) of existing industrial plants, heritage structures, and towers into ±5–10 mm accurate Revit digital twins.
5D BIM (LOD 350/400)
Automated, auditable Bills of Quantities linked directly to 3D BIM element GUIDs—eliminating manual 2D scale-off omissions and tender contingencies.
LOD 350 / 400 MEP
Precision 3D spatial routing of HVAC ducts, chilled-water headers, medical gases, fire sprinklers, and HV/LV cable ladders for complex buildings.
LOD 350 / 400 Steel
Engineer-governed Tekla & Revit structural detailing for clear-span industrial halls, seismic steel frames, space trusses, and precast concrete structures.
LOD 300 / 400 .RFA
Get your building products specified directly into international architectural tenders with lightweight, MEP-connected parametric .RFA and IFC4 libraries.
RIBA Stage 4 / AIA CD
Comprehensive RIBA Stage 4 / HOAI LP 5 / AIA Construction Document sets generated directly from coordinated 3D BIM models—plans, wall sections, wet-cores, stairs, and schedules.
LOD 500 / COBie Digital Twin
Reconciling site redlines, O&M manuals, and commissioning serial numbers into an operational ISO 19650-3 / COBie 2.4 Digital Twin ready for Maximo, Planon, or Archibus.
Masterplan + LOD 350 BIM
High-value residential compound engineering optimizing view corridors, privacy setbacks, subterranean parking, and repeatable modular villa framing.
Masterplan + LOD 350 BIM
Sellable-area optimization, column-aligned underground parking grids, and phased construction BIM for 80–150 apartment & townhouse estates.
Masterplan + LOD 350/400
Operator-standard hospitality masterplanning separating VIP guest realms from Back-of-House logistics, paired with whisper-quiet 58 dB guestroom BIM.
Masterplan + LOD 350 BIM
High-snow-load timber/steel/stone architecture, central 360° suspended hearth lobbies, thermal wellness vaults, and airtight U ≤ 0.16 W/m²K envelopes.
Masterplan + LOD 400 Steel/MEP
Production-flow driven factory architecture integrating 10t–50t overhead bridge cranes, heavy machine foundations, executive offices, and solar-ready roofs.
Masterplan + LOD 350/400
Pallet-yield driven A-class warehouse engineering coordinating 12–16 m clear racking heights, ESFR K25 sprinklers, and cross-dock truck courts.
Masterplan + LOD 350/400 Cold Chain
Zero-thermal-bridge box-in-box PIR envelope detailing, sub-slab frost-heave heating, NH3/CO2 refrigeration BIM, and BRCGS hygienic zoning.
Masterplan + LOD 350/400 Class-A Office
High-efficiency Class-A office floor plates balancing structural daylight depths, unitized curtain-wall solar physics, and clash-free VRF/chilled-beam plenums.
LOD 350 / LOD 400 Healthcare BIM
High-acuity clinical architecture uniting sterile/soiled surgical segregation, ISO Class 5 laminar theatres, 7-system medical gas BIM, and I=1.5 seismic resilience.
Masterplan + LOD 350 Campus BIM
Future-proof learning and R&D campuses uniting BB93 classroom acoustics, VAV fume-hood laboratory plenums, long-span sports halls, and high seismic safety.
Masterplan + LOD 350 Mixed-Use BIM
High-yield mixed-use engineering reconciling wide retail podium spans, residential/office upper grids, isolated F&B exhaust risers, and separated parking/entrances.
Masterplan + LOD 400 Modular DfMA
Rapid-deployment remote EPC, mining, and energy camp villages engineered to IFC/EBRD welfare standards and 40HC container flat-pack logistics.
Scan-to-BIM + LOD 350 Retrofit
Transforming underperforming warehouses, factories, and older commercial blocks into high-yield headquarters, culture hubs, or hospitality assets with low embodied carbon.
LOD 400 Facade Shop Engineering
System-agnostic aluminum-glass curtain-wall engineering delivering mullion inertia statics, pressure-equalized gasket junctions, EI120 spandrel firestops, and CNC cut-lists.
LOD 350 / LOD 400 Rainscreen BIM
Non-combustible ventilated facade engineering across high-density fiber-cement, terracotta, sintered ceramic, and solid aluminum—complete with panel nesting and cavity firestops.
2D/3D FEM Thermal & WUFI Physics
Finite-element isotherm modeling eliminating cantilevered balcony, parapet, and window-jamb condensation risks for DACH, UK, Nordic, and luxury envelope compliance.
LOD 350 / LOD 400 Fire & Acoustic BIM
High-attenuation acoustic glazing/wall assemblies (Rw 42–52 dB) and certified EI60–EI120 fire-compartment envelopes for hotels, hospitals, and high-rise towers near highways/airports.
LOD 400 Structural Facade Statics
Life-safety structural engineering for heavy stone, GRC/UHPC, brick-slip, and glass-fin facades—accommodating ±25–45 mm inter-story seismic drift without fallout.
LOD 400 CNC Roll-Forming DfMA
Machine-ready cold-formed S350GD+Z275 light-gauge steel engineering for villa estates, multi-story housing, roof extensions, and facade infill walls.
LOD 400 Container-Optimized DfMA
Designing luxury resort lodges, student housing pods, bathroom pods, and modular villas around internal 40HC container geometry to slash international shipping costs by 60%.
LOD 350 / LOD 400 Industrial Envelope
Eliminating the #1 plague of factories and warehouses—leaking screw-hole roofs—through thermal-sliding standing seam, TPO akustik decks, FM wind-uplift zoning, and clamp-on PV.
Parametric Solar + LOD 400 Louver BIM
Cutting peak cooling chiller loads by 22%–38% across Mediterranean, GCC, and European glass facades via solar-path-tuned aluminum aerofoils, perforated screens, and kinetic louvers.
LOD 400 Hearth, Flue & Roof Envelope BIM
Preventing smoke rollback, timber-roof chimney fires, and negative-pressure kitchen-hood conflicts in luxury airtight villas and mountain chalets.
Explore complementary BIM levels, building typologies, and facade/DfMA specifications.
ISO 19650 compliant LOD 300, LOD 350 & LOD 400 BIM modeling, 4-discipline clash detection, Scan-to-BIM, 5D BoQ extraction, and custom Revit libraries.
Masterplan architecture and multidisciplinary design for villa compounds, residential communities, 5-star resorts, industrial plants, logistics hubs, and hospitals.
Unitized aluminum curtain wall, A1 ventilated rainscreen facade, thermal-bridge FEM analysis, seismic bracket statics, and 40HC container-ready DfMA steel packages.
Direct technical answers on deliverables, ISO 19650 workflows, revisions, and fee structures.
Share your site parcel, CAD sketches, or point-cloud survey directly with our founding architects and civil engineers. Receive an itemized LOD deliverables matrix and fixed milestone schedule within 24 hours.