SerMimar® Studio · Est. 2008 · ISO 19650 BIM & Architectural Engineering
SERMIMAR EST. 2008
RIBA Stage 4 / AIA CD 2,000 – 45,000 m²

Architectural Construction Documentation (CD Sets): Details, Scope & Fees

Comprehensive RIBA Stage 4 / HOAI LP 5 / AIA Construction Document sets generated directly from coordinated 3D BIM models—plans, wall sections, wet-cores, stairs, and schedules.

Architectural construction documentation sheets generated from coordinated 3D Revit BIM models
1:50 General Plans + 1:20 Cores/Wet Areas + 1:5 Envelope Details 3 – 6 Weeks
Engineering Specification & Fee Snapshot
RIBA Stage 4 · AIA Construction Docs · HOAI LP 5 · ISO 128
BIM Detail Level RIBA Stage 4 / AIA CD
Reference Scale 2,000 – 45,000 m²
Delivery Schedule 3 – 6 Weeks
Indicative Studio Fee $14,500 – $29,000 (for 5,000 m² full CD package)
Ref. Construction CAPEX Tender-Ready Construction Documentation Precision
Native File Outputs .RVT Source + Full 1:50 / 1:20 / 1:5 .DWG & Plotted PDF Set
A B C GRID A-01 / LOD 400 FEDERATED SECTION ARCHITECTURAL ENVELOPE (U ≤ 0.24 W/m²K) STRUCTURAL FRAME & SEISMIC NODE (EC8 / TBDY) MEP CORRIDOR — ZERO CLASH ZONE (±3 mm) 5D BoQ & CNC / SHOP DRAWING OUTPUT SERMIMAR STUDIO · ISO 19650 · IFC4 / RVT / DWG

Technical Parameters & Tolerance Matrix

Engineering Parameter Specification Benchmark
Target BIM Level & Governing Norm RIBA Stage 4 / AIA CD · RIBA Stage 4 · AIA Construction Docs · HOAI LP 5 · ISO 128
Reference Gross Scale 2,000 – 45,000 m²
Coordinated Disciplines 1:50 General Plans + 1:20 Cores/Wet Areas + 1:5 Envelope Details
Milestone Delivery Schedule 3 – 6 Weeks
Indicative Studio Fee Band $14,500 – $29,000 (for 5,000 m² full CD package)
Native File Deliverables .RVT Source + Full 1:50 / 1:20 / 1:5 .DWG & Plotted PDF Set
SEC 01

Project & Engineering Scope Overview

Design studios win prestigious competitions at Stage 2/3, yet technical documentation bottlenecks squeeze studio margins during Stage 4/CD production. SerMimar operates as your senior technical architecture arm—producing watertight, code-checked Construction Documentation straight from federated Revit.

Engineered to RIBA Stage 4 / AIA CD precision across a reference benchmark of 2,000 – 45,000 m² under RIBA Stage 4 · AIA Construction Docs · HOAI LP 5 · ISO 128, this canonical specification unifies spatial design, multidisciplinary clash resolution, and 5D cost certainty prior to site mobilization.

SEC 02

Architectural Layout, Structural Grid & Spatial Zoning

Structural Grid & Modular Alignment: Fully dimensioned 1:50 setting-out plans, masonry/drywall partition types, movement joints, and acoustic/fire wall tags.

Primary column grids, facade mullion subdivisions, and subterranean parking geometry are locked onto a unified datum—eliminating non-standard off-cuts and costly site framing adjustments.

SEC 03

Functional Area Program & Net-to-Gross Floor Plate Optimization

Spatial Program & Net-to-Gross Efficiency: Reflected Ceiling Plans (RCP), floor finish/screed junction plans, and tiling setting-out sheets synchronized with room data sheets.

Live parametric Revit area schedules track net usable/leasable floor area against vertical cores, MEP plantrooms, and envelope wall thickness at every design iteration.

SEC 04

Circulation Cores, Logistics Access & Life-Safety Egress

Vertical Cores, Logistics & Life-Safety Egress: 1:20 stair, elevator core, handrail anchorage, and accessible threshold waterproofing details.

Travel distances, pressurized stair cores, ADA/accessible routing, and heavy service/loading dock swept-path geometry are validated against NFPA, EN, and local building regulations.

SEC 05

Site Utilities, Stormwater Drainage & Wet-Shaft Engineering

Subsurface Utilities, Drainage & Wet Shafts: 1:20 commercial kitchen, bathroom pod, terrace membrane slope, and linear drain waterproofing cross-sections.

Gravity stormwater and foul drainage stacks are modeled with true 1.5%–2.0% invert slopes, locking structural beam web penetrations and acoustic riser sleeves before rebar detailing.

SEC 06

Plumbing, Fire Suppression (NFPA / EN) & Hydronic Piping BIM

Domestic Plumbing, NFPA/EN Sprinkler & Hydronics: Fire compartmentation plans showing EI30/EI60/EI120 rated walls, fire-stopping collars, smoke curtains, and escape signage.

Wet/dry sprinkler grids, fire hose cabinets, booster pump skids, and hydronic manifolds are spatially coordinated above ceiling plenums without compromising architectural clear heights.

SEC 07

HVAC Climatic Routing, Acoustic Control & Zero-Clash MEP

HVAC Routing, Acoustics & Zero-Clash Verification: Coordinated RCPs integrating lighting coves, linear HVAC slots, sprinkler rosettes, and acoustic access panels cleanly.

Automated Navisworks and Solibri rule-sets enforce ±3 mm hard-clash tolerances and 25–50 mm insulation/maintenance clearance zones, closing 100% of BCF issues prior to tender issue.

SEC 08

Structural Steel / RC Framing & Seismic Performance Analysis

Structural Framing & Seismic Engineering: Slab edge step-downs, balcony thermal-break connectors, recessed matwells, and stone cladding shelf-angles coordinated with structure.

Inter-story seismic drift ratios, ductile steel moment/braced connections, foundation punching shear, and secondary facade subframes are signed off by our senior structural engineering partners.

SEC 09

Facade Envelope, Roof Assembly & Hygrothermal U-Value Detailing

Building Envelope & Hygrothermal Physics: 1:5 window jamb/head/sill EPDM & vapor-control details, parapet copings, basement tanking transitions, and expansion joints.

2D/3D thermal-bridge condensation risk is audited per EN ISO 6946, pairing Class A1 mineral-wool insulation, vapor-permeable membranes, and slotted seismic facade brackets at 1:5 shop detail scale.

SEC 10

Georeferenced Site Plan & ISO 19650 Common Data Environment (CDE)

Georeferenced Masterplan & ISO 19650 CDE: 100% live sheet generation from Revit—zero disconnected 2D drafting overrides that contradict the 3D model.

All discipline models share true survey coordinates (UTM / National Grid) and progress through ISO 19650 WIP → Shared → Published gates inside the Common Data Environment.

SEC 11

BIM & Construction Document Deliverables (.RVT / .IFC4 / .NWD / .DWG)

Native BIM & Construction Documentation Package: Native Revit (.RVT) with sheet sets, clean layered AutoCAD (.DWG) exports, hyperlinked vector PDF binders, and NBS/CSI Outline Specs.

Clients receive unlocked native .RVT Source + Full 1:50 / 1:20 / 1:5 .DWG & Plotted PDF Set source files, plotted PDF/DWG construction sets, and signed zero-clash audit certificates.

SEC 12

5D Quantity Take-Off (BoQ), Studio Fee Band & Cost Benchmarks

5D Quantity Take-Off (BoQ) & Indicative Studio Fee: The indicative engineering & BIM fee band for this reference scope is $14,500 – $29,000 (for 5,000 m² full CD package) (with indicative construction CAPEX benchmark at Tender-Ready Construction Documentation Precision). Eliminates contractor ambiguity during tender, preventing expensive design-and-build quality dilution on site.

SEC 13

DfMA Prefabrication, 40HC Export Packaging & Execution Pathways

DfMA Prefabrication & Export Execution Pathways: Standardizes door sets, partition types, and bathroom pod layouts across multi-unit residential and hotel schemes.

Clients may tender the open BIM package to any local contractor or leverage our integrated group factories (SerBuild steel structures, SerMimar İskele EN 12810 scaffolding, SerMimar Şömine hearths, and SerSourcing 40HC consolidation).

SEC 14

International Building Codes, Green Certification & Grant Readiness

International Codes, Sustainability & Compliance: Tailored to UK Approved Documents (RIBA Stage 4), German HOAI LP 5 (1:50 Werkplanung), AIA CD (Imperial/Metric), or Turkish Application Standards.

Structured directly for LEED / BREEAM / RE2020 energy modeling, UK Building Safety Act Golden Thread compliance, Eurocode National Annexes, and institutional lender due diligence.

INTERACTIVE ENGINEERING & FEE ENGINE

BIM, Masterplan & Facade Scope Calculator

UK ISO 19650 · RIBA Stages 2–5 · Part B/L
m²
500 m² 10,000 m² 25,000 m² 60,000+ m²
Estimated Studio Engineering Fee Band $28,000 – $36,200 (€25,800 – €33,300)
Estimated Engineering Load 425–540 man-hours
Milestone Delivery Schedule 3–5 weeks
Est. BIM Views & CD Sheets ~35 sheets / models
Indicative Construction CAPEX Ref. $5,250,000 – $7,750,000
Included Native Deliverables
  • .RVT + Tekla/Structural IFC
  • Seismic Calculation Report
  • .DWG Structural Set
Request Detailed Engineering & Cost Study via WhatsApp
CROSS-DISCIPLINE ARCHITECTURE

Explore complementary BIM levels, building typologies, and facade/DfMA specifications.

TECHNICAL & COMMERCIAL Q&A

Frequently Asked Engineering & Commercial Questions

Direct technical answers on deliverables, ISO 19650 workflows, revisions, and fee structures.

Can SerMimar adopt our architectural practice’s exact graphic style, line weights, and titleblocks?
Yes. When partnering with signature design architects in London, Zurich, Dubai, or New York, we build directly inside your .RTE graphic template so every plotted PDF matches your house typography and line-weight hierarchy.
Are the 1:20 and 1:5 details drawn in disconnected 2D CAD or linked to the 3D Revit model?
All 1:50 plans, sections, elevations, and 1:20 callouts are live 3D Revit views enhanced with parametric 2D detail components at 1:5 scale—preserving sheet-to-sheet callout hyperlinks automatically.
Do you support both Metric (mm/m) and US Imperial (feet and fractional inches) CD sets?
Yes. Our BIM team produces ISO metric sets for UK/EU/MENA and AIA National CAD Standard imperial sets for US and Canadian projects.
What door, window, and finish schedules are included in the CD package?
Complete Door & Hardware Schedules, Curtain-Wall/Window Elevations, Louver Schedules, Partition Type Legends, and Room Finish Matrices are included.
How do we collaborate during Stage 4 design development?
Your design director retains full aesthetic control via weekly Bluebeam Studio / ACC mark-up sessions while our technical architects execute the detailing, waterproofing physics, and MEP coordination.
SECTION 16 · DIRECT ENGINEERING PROPOSAL & WHATSAPP DESK

Request a Scoped BIM, Masterplan or Facade Engineering Proposal

Share your site parcel, CAD sketches, or point-cloud survey directly with our founding architects and civil engineers. Receive an itemized LOD deliverables matrix and fixed milestone schedule within 24 hours.