SerMimar® Studio · Est. 2008 · ISO 19650 BIM & Architectural Engineering
SERMIMAR EST. 2008
SERMIMAR® CORPORATE STUDIO · DOMAIN REGISTERED 2008

Engineering-Governed Architecture & LOD 400 BIM Heritage Since 2008

Uniting architectural masterplanning, high-seismic structural mechanics, hygrothermal building physics, and industrial DfMA fabrication discipline under one Istanbul headquarters.

SerMimar Istanbul architectural masterplanning and 3D BIM coordination studio

Why Manufacturing-Backed BIM & Architecture Outperforms Pure Drafting Bureaus

Registered on November 27, 2008, sermimar.com stands at the digital and engineering root of an architectural, structural, and industrial manufacturing group whose contracting heritage dates back to 1980 and formal engineering governance to 1997.

Unlike software-only BIM outsourcing shops disconnected from physical construction, SerMimar® operates within a vertically integrated ecosystem of 25+ manufacturing and EPC brands—spanning roll-formed S350GD structural steel, Class A1 fiber-cement cladding, EN 12810 scaffolding, and cast-iron hearths. Every Revit family, Tekla connection node, and curtain-wall bracket we detail reflects real factory tolerances and crane erection logic.

OFFICIAL LEGAL & CORPORATE REGISTRY

Operating Legal Entity
CFY Mühendislik Mim. Dan. Yapı Malz. İnş. San. ve Tic. Ltd. Şti.
Tax Office & ID
Etimesgut VD · 2091289512
MERSİS / Sicil
0209128951200001
Parent Industrial Holding
Yağmahan Holding (Engineering, Manufacturing & EPC Group)
Istanbul Studio Headquarters
Cevizli Mah. Orhan Gazi Cad. No: 24/B, 34846 Maltepe, Istanbul, Türkiye
Direct Architect & BIM Desk:
+90 505 507 04 18 (Istanbul HQ Switchboard (Secondary): +90 216 614 04 34)
LEADERSHIP & SIGN-OFF AUTHORITY

Founding Partners & Multidisciplinary Governance

IY

İdris YAĞMAHAN

Architect · Co-Founder & Managing Partner

Leads masterplan site architecture, ISO 19650 multi-discipline BIM coordination (LOD 300–400), hygrothermal curtain-wall and ventilated rainscreen detailing, and container-optimized DfMA packages across international B2B developments.

ISO 19650 & LOD 400 BIM Masterplan Architecture Hygrothermal Facade Envelope 40HC Modular DfMA
idris.yagmahan.com Official Portfolio
CY

Celalettin YAĞMAHAN

Civil Engineer · Co-Founder & Structural Partner

Governs 3D finite-element seismic analysis, cold-formed S350GD and hot-rolled structural steel Tekla/BIM detailing, seismic curtain-wall bracket calculations, and clash-free MEP structural penetration discipline.

Eurocode 3/8 & Seismic PGA Tekla / Revit Steel BIM Facade Bracket Statics Structural Clash Governance
cfymuhendislik.com Official Portfolio
FY

M. Furkan YAĞMAHAN

Interior Architect · Co-Founder & Spatial Partner

Directs LOD 350–400 interior architectural BIM packages, 60 dB acoustic and EI120 fire-rated drywall systems, bespoke joinery schedules, A+ material specifications, and architectural hearth/flue coordination for resorts, villas, and corporate headquarters.

Hospitality & Villa Spatial BIM 60 dB Acoustic & EI120 Walls Bespoke Joinery & FF&E BoQ Architectural Hearth BIM
mf.yagmahan.com Official Portfolio
ISO 19650 QUALITY ASSURANCE

3-Gate Engineering & Zero-Clash QA/QC Protocol

GATE 01 · BEP & DATUM LOCK

ISO 19650 Common Data Environment & Survey Coordinate Alignment

Before modeling begins, true UTM/National Grid survey coordinates, shared parameter files, element LOD matrices, and container naming conventions are locked across all four disciplines.

GATE 02 · AUTOMATED ZERO-CLASH

Navisworks & Solibri Hard-Clash (±3 mm) & Clearance Verification

Structural penetrations, curtain-wall slab-edge anchors, gravity drainage invert slopes, and HVAC maintenance zones pass automated clash rules until zero unresolved BCF issues remain.

GATE 03 · PARTNER SIGN-OFF

Seismic Drift, Hygrothermal Envelope & 5D BoQ Audit

Prior to CDE Published status, our founding architect and civil engineer audit inter-story seismic drift compatibility, EN ISO 6946 condensation safety, and 5D schedule accuracy.

CROSS-DISCIPLINE ARCHITECTURE

Explore complementary BIM levels, building typologies, and facade/DfMA specifications.

TECHNICAL & COMMERCIAL Q&A

Frequently Asked Engineering & Commercial Questions

Direct technical answers on deliverables, ISO 19650 workflows, revisions, and fee structures.

Who is the legal operating entity behind SerMimar.com?
SerMimar.com is officially operated by CFY Mühendislik Mim. Dan. Yapı Malz. İnş. San. ve Tic. Ltd. Şti. (Tax ID: 2091289512, MERSIS: 0209128951200001), headquartered in Maltepe, Istanbul, Türkiye, within the Yağmahan Holding industrial ecosystem.
Who leads the technical sign-off on architectural, structural, and interior BIM packages?
Every commission is directly governed by our three founding partners: Architect İdris YAĞMAHAN (Masterplanning, Envelope & BIM), Civil Engineer Celalettin YAĞMAHAN (Seismic Structural & Steel Statics), and Interior Architect M. Furkan YAĞMAHAN (Hospitality/Villa Spatial BIM & Acoustic/Fire Partitions).
When was the SerMimar® digital brand established?
The root domain sermimar.com was registered on November 27, 2008, building on group contracting roots dating back to 1980 and formal engineering practice established in 1997.
Can international clients visit your Istanbul HQ and Gebze industrial manufacturing corridor?
Yes. Overseas developers, architects, and procurement directors regularly visit our Maltepe Istanbul studio for live Navisworks BIM coordination workshops combined with factory inspections in nearby Gebze–Dilovası OIZ.
What quality assurance gates apply before drawings or BIM models are issued?
Every milestone passes a 3-gate internal QA/QC protocol: automated Solibri/Navisworks zero-clash verification, structural seismic drift and bracket check, and ISO 19650 parameter audit prior to CDE upload.
SECTION 16 · DIRECT ENGINEERING PROPOSAL & WHATSAPP DESK

Request a Scoped BIM, Masterplan or Facade Engineering Proposal

Share your site parcel, CAD sketches, or point-cloud survey directly with our founding architects and civil engineers. Receive an itemized LOD deliverables matrix and fixed milestone schedule within 24 hours.