SerMimar® Studio · Est. 2008 · ISO 19650 BIM & Architectural Engineering
SERMIMAR EST. 2008
24-HOUR SCOPED ENGINEERING RFQ DESK

Request an Itemized Engineering & BIM Proposal

Configure your project brief below or calculate an instant fee estimate—transmitted directly to our founding partners for a 24-hour technical turnaround.

STEP 01

Transmit Parcel / CAD Inputs & Mutual NDA

Share your site boundary, schematic .DWG/.PDF drawings, or laser point-cloud metadata—backed by a 2-hour mutual NDA turnaround whenever required.

STEP 02

24-Hour Itemized LOD & Milestone Proposal

Our founding partners issue a fixed-fee proposal specifying element-by-element LOD targets, clash tolerances, file formats, and weekly milestones.

STEP 03

3-Day Pod Mobilization & CDE Handover

A dedicated 4-discipline BIM/engineering team mobilizes inside our CDE or your ACC hub, delivering unlocked native .RVT, .IFC4, .DWG, and 5D BoQ files.

SECTION 16 · DIRECT ENGINEERING PROPOSAL & WHATSAPP DESK

Request a Scoped BIM, Masterplan or Facade Engineering Proposal

Share your site parcel, CAD sketches, or point-cloud survey directly with our founding architects and civil engineers. Receive an itemized LOD deliverables matrix and fixed milestone schedule within 24 hours.

INTERACTIVE ENGINEERING & FEE ENGINE

BIM, Masterplan & Facade Scope Calculator

EN 1990–1999 Eurocodes · HOAI LP 2–5 · IFC4
m²
500 m² 10,000 m² 25,000 m² 60,000+ m²
Estimated Studio Engineering Fee Band $37,000 – $47,900 (€34,000 – €44,100)
Estimated Engineering Load 545–700 man-hours
Milestone Delivery Schedule 4–6 weeks
Est. BIM Views & CD Sheets ~45 sheets / models
Indicative Construction CAPEX Ref. $5,250,000 – $7,750,000
Included Native Deliverables
  • Federated .RVT / .NWD
  • BCF Clash-Free Audit Report
  • 5D Itemized BoQ (.XLSX)
  • Full CD .DWG Set
Request Detailed Engineering & Cost Study via WhatsApp
CROSS-DISCIPLINE ARCHITECTURE

Explore complementary BIM levels, building typologies, and facade/DfMA specifications.

TECHNICAL & COMMERCIAL Q&A

Frequently Asked Engineering & Commercial Questions

Direct technical answers on deliverables, ISO 19650 workflows, revisions, and fee structures.

How fast will we receive a formal written fee proposal?
Standard BIM, facade, and masterplan briefs receive a structured PDF proposal—detailing LOD matrix, discipline breakdown, file formats, weekly milestones, and fixed fee—within 24 business hours.
Can we commission a paid 1-week pilot zone before awarding a full multi-building campus?
Yes. For large hospitals, resorts, or multi-tower developments, overseas clients frequently start with a defined pilot zone or single structural bay to verify our Revit/IFC standards and clash reporting firsthand.
Do you accept international bank wire transfers in USD, EUR, and GBP?
Yes. Official commercial invoices are issued by CFY Mühendislik Ltd. Şti. with corporate IBAN/SWIFT accounts supporting USD, EUR, GBP, and TRY milestones.
Are design revisions included in fixed-scope milestones?
Yes. Every stage gate includes two structured coordination and design-refinement cycles, ensuring stakeholder comments and value-engineering adjustments are absorbed cleanly without surprise addenda.
Who owns the native .RVT, .IFC, and .DWG intellectual property upon handover?
Upon milestone settlement, full native editable source models (.RVT, .IFC4, .DWG, .NWD, and custom project families) transfer cleanly to the client with zero proprietary lock-in.