SerMimar® Official Platform Network & Vertically Integrated Group Backbone
Why domain specialization matters: every SerMimar® and group platform operates with dedicated engineering authority while sharing unified corporate governance, quality standards, and direct factory supply.
Official SerMimar® Domain Specialization Matrix (Zero Overlap)
| Official Platform | Primary Engineering / Manufacturing Focus | Target Audience |
|---|---|---|
| sermimar.com (Est. 2008) | International & Corporate 3D BIM (LOD 300–400), Architectural Masterplanning, Facade Physics & DfMA Root Hub | Global Developers, EPC Main Contractors, International Architectural Studios |
| sermimar.com.tr | Türkiye TKDK / IPARD / EU Rural-Industrial Grants, Cold-Storage & Agro-Facility Investment Dossiers | Domestic Industrial & Agro-Grant Investors in Türkiye |
| sermimar.net | Monthly m² Construction Cost Indices, Zoning Code Bulletins & Sectoral Media Portal | Quantity Surveyors, Appraisers, Builders & Researchers |
| sermimariskele.com | Certified EN 12810 H-Type Facade Scaffolding, Heavy-Duty Ringlock & EN 1004 Mobile Tower Manufacturing | Facade Contractors, Site Directors & Scaffolding Importers (TR/EN/FR) |
| sermimarsomine.com | Guillotine Lift-Door, 360° Suspended Central & 8 mm GG20 Cast-Iron Architectural Fireplace Manufacturing | Luxury Villa Developers, Hospitality Specifiers & Interior Architects |
Tier 1: Official SerMimar® Branded Sibling Platforms
SerMimar® Yatırım & Hibe
Investment & Grant Advisory (TR)Official Türkiye investment engineering and EU/TKDK/IPARD rural-industrial grant dossier platform for cold-storage, agro-processing, and production facilities.
SerMimar.Net Yapı Portalı
Construction Cost Index & MediaSectoral intelligence portal publishing construction m² cost benchmarks, zoning regulations, material unit rates, and technical building guides.
SerMimar® İskele
EN 12810 Facade & Ringlock ScaffoldingFactory-direct manufacturer and global exporter (TR/EN/FR) of EN 12810 H-type facade scaffolding, heavy-duty Ringlock systems, and EN 1004 mobile towers from Gebze OIZ.
SerMimar® Şömine
Architectural & Cast-Iron HearthsManufacturer of guillotine lift-door hearths, 360° central suspended fireplaces, hydronic boiler inserts, and 8 mm GG20 cast-iron chambers for luxury villas and resorts.
Tier 2: Vertically Integrated Group Manufacturing, Steel & Engineering Brands
When clients wish to move seamlessly from LOD 400 digital engineering to factory supply and container consolidation, SerMimar connects directly into our sister manufacturing divisions.
Yağmahan Holding
Parent Industrial & EPC HoldingCorporate parent umbrella uniting 25+ engineering, roll-forming steel, building envelope, and turnkey EPC contracting brands since 1980.
SerBuild
Engineered Steel Building ExportInternational manufacturing and export platform converting SerMimar LOD 400 DfMA models into pre-engineered structural and light-gauge steel buildings.
SerSourcing
7-Language Buying & QC OfficeArchitect-led buying office in Türkiye executing factory audits, technical spec verification, and multi-supplier 40HC container consolidation.
CFY Mimarlık
Turnkey Fit-Out & Interior Renovation (TR)Domestic residential villa, corporate office, and clinic interior architecture and engineer-supervised turnkey renovation studio.
CFY Mühendislik
Seismic Statics & Structural RetrofitStructural seismic performance assessment, CFRP carbon-fiber and steel-jacket retrofitting, and structural supervision practice.
4Proje
4-Discipline Municipal Permit Sets (TR)Municipal building permit coordination across architectural, structural, mechanical, and electrical disciplines across Türkiye.
SerParsel
Zoning, FAR/KAKS & Parcel AnalyticsDigital cadastral parcel feasibility, floor-area-ratio optimization, and zoning envelope analytics platform.
SerFibro · SerPan · SerProfil
A1 Cladding, Insulated Panels & ProfilesGroup manufacturing lines producing A1 non-combustible fiber-cement boards, insulated facade/roof panels, and galvanized C/U framing profiles.
Related Engineering Packages & Typologies
Explore complementary BIM levels, building typologies, and facade/DfMA specifications.
3D BIM Services
ISO 19650 compliant LOD 300, LOD 350 & LOD 400 BIM modeling, 4-discipline clash detection, Scan-to-BIM, 5D BoQ extraction, and custom Revit libraries.
Masterplanning
Masterplan architecture and multidisciplinary design for villa compounds, residential communities, 5-star resorts, industrial plants, logistics hubs, and hospitals.
Facade & DfMA
Unitized aluminum curtain wall, A1 ventilated rainscreen facade, thermal-bridge FEM analysis, seismic bracket statics, and 40HC container-ready DfMA steel packages.
Frequently Asked Engineering & Commercial Questions
Direct technical answers on deliverables, ISO 19650 workflows, revisions, and fee structures.
Why does SerMimar operate distinct specialized domains instead of one generic catalog?
Are SerMimarIskele.com and SerMimarSomine.com operated by the same corporate group?
Which platform should I use for TKDK / IPARD agricultural or rural industrial grants in Türkiye?
Where can I check monthly Turkish construction m² cost indices and regulatory articles?
Can we procure steel structures, facade panels, scaffolding, and fireplaces under one consolidated export contract?
Request a Scoped BIM, Masterplan or Facade Engineering Proposal
Share your site parcel, CAD sketches, or point-cloud survey directly with our founding architects and civil engineers. Receive an itemized LOD deliverables matrix and fixed milestone schedule within 24 hours.