LOD 300
LOD 300 Architectural & Structural BIM
Design-development and permit-grade 3D BIM geometry with verified wall assemblies, structural column/beam sizing, and code-compliant egress schedules.
Eliminate expensive site rework before mobilization. Federated Architectural, Structural, Mechanical, and Electrical BIM engineering from LOD 300 design development to LOD 400 shop fabrication.
LOD 300
Design-development and permit-grade 3D BIM geometry with verified wall assemblies, structural column/beam sizing, and code-compliant egress schedules.
LOD 350
Construction-ready RIBA Stage 4 federated coordination modeling exact structural connections, MEP hangers, slab penetrations, and zero-clash ceiling plenums.
LOD 400
Direct-to-factory digital twins containing bolt/weld assembly marks, MEP prefabrication spool sheets, curtain-wall machining details, and zero-waste cut lists.
LOD 350 / 400
Rule-based Navisworks & Solibri spatial auditing plus active engineering redesign to deliver signed zero-clash construction models.
ISO 19650 EIR / BEP
End-to-end BIM Information Management establishing airtight EIRs, Master Information Delivery Plans (MIDP), naming conventions, and COBie asset schemas.
LOD 300 / 350 (LOA 30)
Converting raw LiDAR laser scans (.E57 / .RCP) of existing industrial plants, heritage structures, and towers into ±5–10 mm accurate Revit digital twins.
5D BIM (LOD 350/400)
Automated, auditable Bills of Quantities linked directly to 3D BIM element GUIDs—eliminating manual 2D scale-off omissions and tender contingencies.
LOD 350 / 400 MEP
Precision 3D spatial routing of HVAC ducts, chilled-water headers, medical gases, fire sprinklers, and HV/LV cable ladders for complex buildings.
LOD 350 / 400 Steel
Engineer-governed Tekla & Revit structural detailing for clear-span industrial halls, seismic steel frames, space trusses, and precast concrete structures.
LOD 300 / 400 .RFA
Get your building products specified directly into international architectural tenders with lightweight, MEP-connected parametric .RFA and IFC4 libraries.
RIBA Stage 4 / AIA CD
Comprehensive RIBA Stage 4 / HOAI LP 5 / AIA Construction Document sets generated directly from coordinated 3D BIM models—plans, wall sections, wet-cores, stairs, and schedules.
LOD 500 / COBie Digital Twin
Reconciling site redlines, O&M manuals, and commissioning serial numbers into an operational ISO 19650-3 / COBie 2.4 Digital Twin ready for Maximo, Planon, or Archibus.
Explore complementary BIM levels, building typologies, and facade/DfMA specifications.
Masterplan architecture and multidisciplinary design for villa compounds, residential communities, 5-star resorts, industrial plants, logistics hubs, and hospitals.
Unitized aluminum curtain wall, A1 ventilated rainscreen facade, thermal-bridge FEM analysis, seismic bracket statics, and 40HC container-ready DfMA steel packages.
Comprehensive engineering comparison of BIM Level of Development LOD 300, LOD 350, and LOD 400: geometry, interface brackets, MEP clearances, 5D BoQ accuracy, and fees.
Direct technical answers on deliverables, ISO 19650 workflows, revisions, and fee structures.
Share your site parcel, CAD sketches, or point-cloud survey directly with our founding architects and civil engineers. Receive an itemized LOD deliverables matrix and fixed milestone schedule within 24 hours.