SerMimar® Studio · Est. 2008 · ISO 19650 BIM & Architectural Engineering
SERMIMAR EST. 2008
LOD 400 3,000 – 40,000 m²

LOD 400 Fabrication & Shop Drawing BIM: CNC Outputs, Spools & Fee Guide

Direct-to-factory digital twins containing bolt/weld assembly marks, MEP prefabrication spool sheets, curtain-wall machining details, and zero-waste cut lists.

LOD 400 fabrication BIM model displaying structural steel gusset bolts, MEP spool assemblies, and shop drawing tags
4-Discipline Fabrication + Steel/Facade/MEP Spools 5 – 8 Weeks
Engineering Specification & Fee Snapshot
ISO 19650 · AIA LOD 400 · EN 1090 EXC2/EXC3
BIM Detail Level LOD 400
Reference Scale 3,000 – 40,000 m²
Delivery Schedule 5 – 8 Weeks
Indicative Studio Fee $32,000 – $58,000 (for 10,000 m² ref.)
Ref. Construction CAPEX $6.5M – $11.5M Construction Ref.
Native File Outputs .RVT · Tekla .IFC · CNC DSTV/NC1 · Spool & Shop .DWG
A B C GRID A-01 / LOD 400 FEDERATED SECTION ARCHITECTURAL ENVELOPE (U ≤ 0.24 W/m²K) STRUCTURAL FRAME & SEISMIC NODE (EC8 / TBDY) MEP CORRIDOR — ZERO CLASH ZONE (±3 mm) 5D BoQ & CNC / SHOP DRAWING OUTPUT SERMIMAR STUDIO · ISO 19650 · IFC4 / RVT / DWG

Technical Parameters & Tolerance Matrix

Engineering Parameter Specification Benchmark
Target BIM Level & Governing Norm LOD 400 · ISO 19650 · AIA LOD 400 · EN 1090 EXC2/EXC3
Reference Gross Scale 3,000 – 40,000 m²
Coordinated Disciplines 4-Discipline Fabrication + Steel/Facade/MEP Spools
Milestone Delivery Schedule 5 – 8 Weeks
Indicative Studio Fee Band $32,000 – $58,000 (for 10,000 m² ref.)
Native File Deliverables .RVT · Tekla .IFC · CNC DSTV/NC1 · Spool & Shop .DWG
SEC 01

Project & Engineering Scope Overview

LOD 400 Fabrication BIM bridges the final mile between technical design and factory CNC machines—modeling every gusset plate, high-strength bolt grade, weld bevel, Victaulic/flanged pipe spool, ductwork Pittsburgh seam, and curtain-wall extrusion cut length.

Engineered to LOD 400 precision across a reference benchmark of 3,000 – 40,000 m² under ISO 19650 · AIA LOD 400 · EN 1090 EXC2/EXC3, this canonical specification unifies spatial design, multidisciplinary clash resolution, and 5D cost certainty prior to site mobilization.

SEC 02

Architectural Layout, Structural Grid & Spatial Zoning

Structural Grid & Modular Alignment: Sub-millimeter fabrication datum accounting for thermal expansion joints, erection shimming tolerances (±2 mm), and crane lifting sequences.

Primary column grids, facade mullion subdivisions, and subterranean parking geometry are locked onto a unified datum—eliminating non-standard off-cuts and costly site framing adjustments.

SEC 03

Functional Area Program & Net-to-Gross Floor Plate Optimization

Spatial Program & Net-to-Gross Efficiency: Zone-by-zone and floor-by-floor assembly work packages structured around erection crane reach and off-site modular skids.

Live parametric Revit area schedules track net usable/leasable floor area against vertical cores, MEP plantrooms, and envelope wall thickness at every design iteration.

SEC 04

Circulation Cores, Logistics Access & Life-Safety Egress

Vertical Cores, Logistics & Life-Safety Egress: Rigging paths, plantroom equipment haul-in routes, and modular corridor rack installation clearances verified in 4D sequence.

Travel distances, pressurized stair cores, ADA/accessible routing, and heavy service/loading dock swept-path geometry are validated against NFPA, EN, and local building regulations.

SEC 05

Site Utilities, Stormwater Drainage & Wet-Shaft Engineering

Subsurface Utilities, Drainage & Wet Shafts: Pre-sloped prefabricated drainage trees and cast-in puddle flanges scheduled with exact invert coordinates and part numbers.

Gravity stormwater and foul drainage stacks are modeled with true 1.5%–2.0% invert slopes, locking structural beam web penetrations and acoustic riser sleeves before rebar detailing.

SEC 06

Plumbing, Fire Suppression (NFPA / EN) & Hydronic Piping BIM

Domestic Plumbing, NFPA/EN Sprinkler & Hydronics: Isometric pipework spool sheets detailing cut pipe lengths, grooved/welded fittings, hanger rod cut-lists, and hydrotest zones.

Wet/dry sprinkler grids, fire hose cabinets, booster pump skids, and hydronic manifolds are spatially coordinated above ceiling plenums without compromising architectural clear heights.

SEC 07

HVAC Climatic Routing, Acoustic Control & Zero-Clash MEP

HVAC Routing, Acoustics & Zero-Clash Verification: SMACNA/DW144 sheet-metal duct piece numbering, flange-to-flange spool lengths, and acoustic attenuator rigging brackets.

Automated Navisworks and Solibri rule-sets enforce ±3 mm hard-clash tolerances and 25–50 mm insulation/maintenance clearance zones, closing 100% of BCF issues prior to tender issue.

SEC 08

Structural Steel / RC Framing & Seismic Performance Analysis

Structural Framing & Seismic Engineering: EN 1090 EXC2/EXC3 steel part & assembly drawings, bolt torque lists (8.8 / 10.9 HV), CNC DSTV (.NC1) plate/profile files, and rebar bar-bending schedules (BBS).

Inter-story seismic drift ratios, ductile steel moment/braced connections, foundation punching shear, and secondary facade subframes are signed off by our senior structural engineering partners.

SEC 09

Facade Envelope, Roof Assembly & Hygrothermal U-Value Detailing

Building Envelope & Hygrothermal Physics: Unitized facade panel machining tickets, silicone bite calculations, EPDM gasket profiles, and anodized bracket shop tickets.

2D/3D thermal-bridge condensation risk is audited per EN ISO 6946, pairing Class A1 mineral-wool insulation, vapor-permeable membranes, and slotted seismic facade brackets at 1:5 shop detail scale.

SEC 10

Georeferenced Site Plan & ISO 19650 Common Data Environment (CDE)

Georeferenced Masterplan & ISO 19650 CDE: Barcode/QR-ready element GUID tracking inside ISO 19650 CDE linking factory QC inspection to on-site installation.

All discipline models share true survey coordinates (UTM / National Grid) and progress through ISO 19650 WIP → Shared → Published gates inside the Common Data Environment.

SEC 11

BIM & Construction Document Deliverables (.RVT / .IFC4 / .NWD / .DWG)

Native BIM & Construction Documentation Package: LOD 400 .RVT / Tekla models, .NC1 / .DXF laser & roll-forming files, MEP spool PDFs, rebar BBS schedules, and erection manuals.

Clients receive unlocked native .RVT · Tekla .IFC · CNC DSTV/NC1 · Spool & Shop .DWG source files, plotted PDF/DWG construction sets, and signed zero-clash audit certificates.

SEC 12

5D Quantity Take-Off (BoQ), Studio Fee Band & Cost Benchmarks

5D Quantity Take-Off (BoQ) & Indicative Studio Fee: The indicative engineering & BIM fee band for this reference scope is $32,000 – $58,000 (for 10,000 m² ref.) (with indicative construction CAPEX benchmark at $6.5M – $11.5M Construction Ref.). Locks procurement quantities to ±0.5% accuracy, slashing steel/MEP fabrication waste and cutting site installation labor by up to 35%.

SEC 13

DfMA Prefabrication, 40HC Export Packaging & Execution Pathways

DfMA Prefabrication & Export Execution Pathways: Directly compatible with SerBuild CNC roll-forming/structural lines and 40HC export crating schedules.

Clients may tender the open BIM package to any local contractor or leverage our integrated group factories (SerBuild steel structures, SerMimar İskele EN 12810 scaffolding, SerMimar Şömine hearths, and SerSourcing 40HC consolidation).

SEC 14

International Building Codes, Green Certification & Grant Readiness

International Codes, Sustainability & Compliance: EN 1090-2 steel execution, SMACNA / DW144 ductwork, BS 8666 rebar detailing, and AIA G202 LOD 400.

Structured directly for LEED / BREEAM / RE2020 energy modeling, UK Building Safety Act Golden Thread compliance, Eurocode National Annexes, and institutional lender due diligence.

INTERACTIVE ENGINEERING & FEE ENGINE

BIM, Masterplan & Facade Scope Calculator

EN 1990–1999 Eurocodes · HOAI LP 2–5 · IFC4
m²
500 m² 10,000 m² 25,000 m² 60,000+ m²
Estimated Studio Engineering Fee Band $65,300 – $84,600 (€60,100 – €77,800)
Estimated Engineering Load 950–1210 man-hours
Milestone Delivery Schedule 6–10 weeks
Est. BIM Views & CD Sheets ~90 sheets / models
Indicative Construction CAPEX Ref. $5,800,000 – $9,200,000
Included Native Deliverables
  • LOD 400 Fabrication .RVT/.IFC
  • Facade Thermal & Bracket Calcs
  • 40HC DfMA Assembly & CNC Schedules
  • 5D Master BoQ
Request Detailed Engineering & Cost Study via WhatsApp
CROSS-DISCIPLINE ARCHITECTURE

Explore complementary BIM levels, building typologies, and facade/DfMA specifications.

TECHNICAL & COMMERCIAL Q&A

Frequently Asked Engineering & Commercial Questions

Direct technical answers on deliverables, ISO 19650 workflows, revisions, and fee structures.

Who typically commissions LOD 400 BIM from SerMimar?
EPC main contractors, structural steel fabricators, facade subcontractors, MEP trade contractors, and developers procuring prefabricated buildings who need direct shop drawings and CNC machine files.
Do you output NC1 (DSTV) and DXF files directly for CNC steel plasma, laser, and roll-forming machines?
Yes. Our structural LOD 400 packages generate verified DSTV (.NC1) profile files, flat-plate .DXF nesting files, bolt-hole schedules, and part-marked assembly drawings.
What is included in your MEP LOD 400 prefabrication spool sheets?
Each spool sheet isolates a transportable module of pipework or ductwork with isometric views, exact cut lengths, fitting BOMs, weld/groove tags, and total rigging weight.
Can LOD 400 rebar models generate automated Bar Bending Schedules (BBS)?
Yes. Concrete elements modeled at LOD 400 include 3D clash-checked reinforcement cages (especially at dense beam-column seismic joints) outputting BS 8666 / Eurocode 2 bending schedules.
How do you handle manufacturer-specific equipment dimensions in LOD 400?
Unlike LOD 300 generic placeholders, LOD 400 incorporates the exact approved vendor submittal geometry (chillers, switchgear, facade extrusions, hearths) prior to releasing shop sheets.
SECTION 16 · DIRECT ENGINEERING PROPOSAL & WHATSAPP DESK

Request a Scoped BIM, Masterplan or Facade Engineering Proposal

Share your site parcel, CAD sketches, or point-cloud survey directly with our founding architects and civil engineers. Receive an itemized LOD deliverables matrix and fixed milestone schedule within 24 hours.