SerMimar® Studio · Est. 2008 · ISO 19650 BIM & Architectural Engineering
SERMIMAR EST. 2008
LOD 400 CNC Roll-Forming DfMA 150 – 15,000 m² LGS Developments

DfMA Light-Gauge Steel Framing Packages: EN 1993-1-3 Statics, CNC & Fees

Machine-ready cold-formed S350GD+Z275 light-gauge steel engineering for villa estates, multi-story housing, roof extensions, and facade infill walls.

3D BIM light-gauge steel framing assembly showing cold-formed galvanized studs, joists, X-bracing, and pre-punched MEP service holes
LGS Cold-Formed Structural Statics + Revit/Vertex/FrameCAD LOD 400 + Dry-Envelope Details 2 – 4 Weeks
Engineering Specification & Fee Snapshot
EN 1993-1-3 Cold-Formed · AISI S100 · S350GD+Z275/AZ150 · Vertex BD / FrameCAD
BIM Detail Level LOD 400 CNC Roll-Forming DfMA
Reference Scale 150 – 15,000 m² LGS Developments
Delivery Schedule 2 – 4 Weeks
Indicative Studio Fee $6,500 – $19,500 (for Villa Compound / Multi-Unit LGS DfMA Package)
Ref. Construction CAPEX Cuts Site Erection Labor by 55% & Eliminates Wet Masonry Delays
Native File Outputs CNC Roll-Former CSV/XML + Panel Assembly Drawings + EN 1993-1-3 Statics + Screw/Board BoQ
A B C FACADE HYGROTHERMAL & SEISMIC BRACKET SECTION ARCHITECTURAL ENVELOPE (U ≤ 0.24 W/m²K) STRUCTURAL FRAME & SEISMIC NODE (EC8 / TBDY) MEP CORRIDOR — ZERO CLASH ZONE (±3 mm) 5D BoQ & CNC / SHOP DRAWING OUTPUT SERMIMAR STUDIO · ISO 19650 · IFC4 / RVT / DWG

Technical Parameters & Tolerance Matrix

Engineering Parameter Specification Benchmark
Target BIM Level & Governing Norm LOD 400 CNC Roll-Forming DfMA · EN 1993-1-3 Cold-Formed · AISI S100 · S350GD+Z275/AZ150 · Vertex BD / FrameCAD
Reference Gross Scale 150 – 15,000 m² LGS Developments
Coordinated Disciplines LGS Cold-Formed Structural Statics + Revit/Vertex/FrameCAD LOD 400 + Dry-Envelope Details
Milestone Delivery Schedule 2 – 4 Weeks
Indicative Studio Fee Band $6,500 – $19,500 (for Villa Compound / Multi-Unit LGS DfMA Package)
Native File Deliverables CNC Roll-Former CSV/XML + Panel Assembly Drawings + EN 1993-1-3 Statics + Screw/Board BoQ
SEC 01

Project & Engineering Scope Overview

Cold-formed Light-Gauge Steel (LGS) is only fast when engineered as true DfMA: every stud swage, dimple screw hole, lip notch, and pre-punched Ø38 mm MEP service conduit must come off the CNC roll-former ready to assemble like watchwork—with zero angle-grinder cutting on site.

Engineered to LOD 400 CNC Roll-Forming DfMA precision across a reference benchmark of 150 – 15,000 m² LGS Developments under EN 1993-1-3 Cold-Formed · AISI S100 · S350GD+Z275/AZ150 · Vertex BD / FrameCAD, this canonical specification unifies spatial design, multidisciplinary clash resolution, and 5D cost certainty prior to site mobilization.

SEC 02

Architectural Layout, Structural Grid & Spatial Zoning

Structural Grid & Modular Alignment: 400 mm / 600 mm stud spacing synchronized exactly with 1,200 / 1,250 mm exterior sheathing boards (A1 fiber-cement / OSB / gypsum) for zero waste.

Primary column grids, facade mullion subdivisions, and subterranean parking geometry are locked onto a unified datum—eliminating non-standard off-cuts and costly site framing adjustments.

SEC 03

Functional Area Program & Net-to-Gross Floor Plate Optimization

Spatial Program & Net-to-Gross Efficiency: 1–4 story residential villas, resort bungalows, rooftop lightweight penthouse extensions, modular dormitories, and non-load-bearing high-rise infill walls.

Live parametric Revit area schedules track net usable/leasable floor area against vertical cores, MEP plantrooms, and envelope wall thickness at every design iteration.

SEC 04

Circulation Cores, Logistics Access & Life-Safety Egress

Vertical Cores, Logistics & Life-Safety Egress: Pre-engineered LGS stair stringers, wide window/sliding-door hot-rolled hybrid lintel headers, and cantilevered balcony trusses.

Travel distances, pressurized stair cores, ADA/accessible routing, and heavy service/loading dock swept-path geometry are validated against NFPA, EN, and local building regulations.

SEC 05

Site Utilities, Stormwater Drainage & Wet-Shaft Engineering

Subsurface Utilities, Drainage & Wet Shafts: Pre-punched flanged service web holes aligned horizontally across studs so PEX water pipes and electrical conduits thread straight through.

Gravity stormwater and foul drainage stacks are modeled with true 1.5%–2.0% invert slopes, locking structural beam web penetrations and acoustic riser sleeves before rebar detailing.

SEC 06

Plumbing, Fire Suppression (NFPA / EN) & Hydronic Piping BIM

Domestic Plumbing, NFPA/EN Sprinkler & Hydronics: 60-to-120-minute fire-resistance rated (REI 60 / REI 120) multi-layer Type-X / fireboard + mineral-wool wall and floor-joist assemblies.

Wet/dry sprinkler grids, fire hose cabinets, booster pump skids, and hydronic manifolds are spatially coordinated above ceiling plenums without compromising architectural clear heights.

SEC 07

HVAC Climatic Routing, Acoustic Control & Zero-Clash MEP

HVAC Routing, Acoustics & Zero-Clash Verification: Lattice C-profile open-web floor joists allowing 200–250 mm HVAC ducts and drainage pipes to pass inside the structural floor zone.

Automated Navisworks and Solibri rule-sets enforce ±3 mm hard-clash tolerances and 25–50 mm insulation/maintenance clearance zones, closing 100% of BCF issues prior to tender issue.

SEC 08

Structural Steel / RC Framing & Seismic Performance Analysis

Structural Framing & Seismic Engineering: EN 1993-1-3 / AISI S100 effective-width buckling checks, X-strap shear walls, Simpson-style tension hold-down anchors, and S350GD+Z275/AZ150 specs.

Inter-story seismic drift ratios, ductile steel moment/braced connections, foundation punching shear, and secondary facade subframes are signed off by our senior structural engineering partners.

SEC 09

Facade Envelope, Roof Assembly & Hygrothermal U-Value Detailing

Building Envelope & Hygrothermal Physics: Warm-frame external rigid mineral-wool continuous insulation eliminating thermal bridging across steel studs (U ≤ 0.16–0.20 W/m²K).

2D/3D thermal-bridge condensation risk is audited per EN ISO 6946, pairing Class A1 mineral-wool insulation, vapor-permeable membranes, and slotted seismic facade brackets at 1:5 shop detail scale.

SEC 10

Georeferenced Site Plan & ISO 19650 Common Data Environment (CDE)

Georeferenced Masterplan & ISO 19650 CDE: Every wall frame and roof truss tagged (W-101, T-204) with inkjet roll-former part printing matching 1:20 shop assembly sheets.

All discipline models share true survey coordinates (UTM / National Grid) and progress through ISO 19650 WIP → Shared → Published gates inside the Common Data Environment.

SEC 11

BIM & Construction Document Deliverables (.RVT / .IFC4 / .NWD / .DWG)

Native BIM & Construction Documentation Package: EN 1993-1-3 / AISI Structural Calculation Book, CNC Roll-Former Files (CSV/XML), Wall/Truss Shop Sheets, Foundation Anchor Plan, and Board/Screw BoQ.

Clients receive unlocked native CNC Roll-Former CSV/XML + Panel Assembly Drawings + EN 1993-1-3 Statics + Screw/Board BoQ source files, plotted PDF/DWG construction sets, and signed zero-clash audit certificates.

SEC 12

5D Quantity Take-Off (BoQ), Studio Fee Band & Cost Benchmarks

5D Quantity Take-Off (BoQ) & Indicative Studio Fee: The indicative engineering & BIM fee band for this reference scope is $6,500 – $19,500 (for Villa Compound / Multi-Unit LGS DfMA Package) (with indicative construction CAPEX benchmark at Cuts Site Erection Labor by 55% & Eliminates Wet Masonry Delays). Hybridizing S350GD cold-formed studs with targeted hot-rolled box columns only at wide 5 m glass sliders cuts steel weight by 18%.

SEC 13

DfMA Prefabrication, 40HC Export Packaging & Execution Pathways

DfMA Prefabrication & Export Execution Pathways: Compatible with FrameCAD, Scottsdale, Pinnacle, Howick, or direct production via our group SerBuild / SerProfil roll-forming lines.

Clients may tender the open BIM package to any local contractor or leverage our integrated group factories (SerBuild steel structures, SerMimar İskele EN 12810 scaffolding, SerMimar Şömine hearths, and SerSourcing 40HC consolidation).

SEC 14

International Building Codes, Green Certification & Grant Readiness

International Codes, Sustainability & Compliance: Eurocode 3 Part 1-3 (EN 1993-1-3), North American AISI S100, EN 10346 S350GD+Z275/AZ150 Coating, and SCI P301/P402 Acoustic/Thermal Guides.

Structured directly for LEED / BREEAM / RE2020 energy modeling, UK Building Safety Act Golden Thread compliance, Eurocode National Annexes, and institutional lender due diligence.

INTERACTIVE ENGINEERING & FEE ENGINE

BIM, Masterplan & Facade Scope Calculator

EN 1990–1999 Eurocodes · HOAI LP 2–5 · IFC4
m²
500 m² 10,000 m² 25,000 m² 60,000+ m²
Estimated Studio Engineering Fee Band $30,700 – $39,800 (€28,200 – €36,600)
Estimated Engineering Load 455–580 man-hours
Milestone Delivery Schedule 3–5 weeks
Est. BIM Views & CD Sheets ~27 sheets / models
Indicative Construction CAPEX Ref. $2,625,000 – $3,875,000
Included Native Deliverables
  • LOD 400 Fabrication .RVT/.IFC
  • Facade Thermal & Bracket Calcs
  • 40HC DfMA Assembly & CNC Schedules
  • 5D Master BoQ
Request Detailed Engineering & Cost Study via WhatsApp
CROSS-DISCIPLINE ARCHITECTURE

Explore complementary BIM levels, building typologies, and facade/DfMA specifications.

TECHNICAL & COMMERCIAL Q&A

Frequently Asked Engineering & Commercial Questions

Direct technical answers on deliverables, ISO 19650 workflows, revisions, and fee structures.

Which CNC roll-forming machines are your LGS DfMA files compatible with?
We export clean neutral CSV/XML CNC machine code and shop drawings compatible with FrameCAD, Howick, Scottsdale, Pinnacle, Arkitech, and similar 89 mm / 140 mm / 150 mm C-section roll-formers—or supply pre-manufactured frames via SerBuild.
How do you prevent steel studs from creating "ghosting" stains and thermal bridges in cold climates?
Steel conducts heat 350× faster than timber. Placing insulation only between studs causes condensation stripes ("ghosting"). We always wrap an unbroken 50–100 mm exterior mineral-wool/EPS blanket outside the breather membrane ("warm-frame" physics).
How do you make lightweight steel floors feel solid and silent like concrete slabs?
Bare OSB over LGS joists feels bouncy and transmits footsteps. We engineer L/480 stiffened lattice joists topped with acoustic resilient strips, dry screed cement-fiber boards (or 45 mm micro-screed), and mineral wool—achieving solid feel and airborne/impact sound ≥ 54 dB.
Can Light-Gauge Steel be used to add 1 or 2 extra stories onto an existing concrete building?
Yes! Because an LGS structure weighs roughly 1/5th of reinforced concrete (~180–240 kg/m² dead load vs. ~1,100 kg/m²), rooftop vertical extensions often require minimal or zero foundation underpinning.
What steel grade and corrosion coating do you specify for coastal vs. inland projects?
Standard inland builds use structural S350GD with Z275 hot-dip zinc (275 g/m²); coastal marine resorts within 2 km of saltwater receive AZ150 AluZinc or ZM310 Zinc-Magnesium coating per EN 10346.
SECTION 16 · DIRECT ENGINEERING PROPOSAL & WHATSAPP DESK

Request a Scoped BIM, Masterplan or Facade Engineering Proposal

Share your site parcel, CAD sketches, or point-cloud survey directly with our founding architects and civil engineers. Receive an itemized LOD deliverables matrix and fixed milestone schedule within 24 hours.