Masterplan + LOD 350 BIM
20-Villa Gated Compound Masterplan
High-value residential compound engineering optimizing view corridors, privacy setbacks, subterranean parking, and repeatable modular villa framing.
High-yield site planning, topography-driven infrastructure grading, and multidisciplinary building design engineered simultaneously for spatial prestige and construction CAPEX efficiency.
Masterplan + LOD 350 BIM
High-value residential compound engineering optimizing view corridors, privacy setbacks, subterranean parking, and repeatable modular villa framing.
Masterplan + LOD 350 BIM
Sellable-area optimization, column-aligned underground parking grids, and phased construction BIM for 80–150 apartment & townhouse estates.
Masterplan + LOD 350/400
Operator-standard hospitality masterplanning separating VIP guest realms from Back-of-House logistics, paired with whisper-quiet 58 dB guestroom BIM.
Masterplan + LOD 350 BIM
High-snow-load timber/steel/stone architecture, central 360° suspended hearth lobbies, thermal wellness vaults, and airtight U ≤ 0.16 W/m²K envelopes.
Masterplan + LOD 400 Steel/MEP
Production-flow driven factory architecture integrating 10t–50t overhead bridge cranes, heavy machine foundations, executive offices, and solar-ready roofs.
Masterplan + LOD 350/400
Pallet-yield driven A-class warehouse engineering coordinating 12–16 m clear racking heights, ESFR K25 sprinklers, and cross-dock truck courts.
Masterplan + LOD 350/400 Cold Chain
Zero-thermal-bridge box-in-box PIR envelope detailing, sub-slab frost-heave heating, NH3/CO2 refrigeration BIM, and BRCGS hygienic zoning.
Masterplan + LOD 350/400 Class-A Office
High-efficiency Class-A office floor plates balancing structural daylight depths, unitized curtain-wall solar physics, and clash-free VRF/chilled-beam plenums.
LOD 350 / LOD 400 Healthcare BIM
High-acuity clinical architecture uniting sterile/soiled surgical segregation, ISO Class 5 laminar theatres, 7-system medical gas BIM, and I=1.5 seismic resilience.
Masterplan + LOD 350 Campus BIM
Future-proof learning and R&D campuses uniting BB93 classroom acoustics, VAV fume-hood laboratory plenums, long-span sports halls, and high seismic safety.
Masterplan + LOD 350 Mixed-Use BIM
High-yield mixed-use engineering reconciling wide retail podium spans, residential/office upper grids, isolated F&B exhaust risers, and separated parking/entrances.
Masterplan + LOD 400 Modular DfMA
Rapid-deployment remote EPC, mining, and energy camp villages engineered to IFC/EBRD welfare standards and 40HC container flat-pack logistics.
Scan-to-BIM + LOD 350 Retrofit
Transforming underperforming warehouses, factories, and older commercial blocks into high-yield headquarters, culture hubs, or hospitality assets with low embodied carbon.
Explore complementary BIM levels, building typologies, and facade/DfMA specifications.
ISO 19650 compliant LOD 300, LOD 350 & LOD 400 BIM modeling, 4-discipline clash detection, Scan-to-BIM, 5D BoQ extraction, and custom Revit libraries.
Unitized aluminum curtain wall, A1 ventilated rainscreen facade, thermal-bridge FEM analysis, seismic bracket statics, and 40HC container-ready DfMA steel packages.
Instantly calculate indicative architectural masterplan, 4-discipline BIM coordination, clash detection, and facade engineering fees, man-hours, and delivery weeks.
Direct technical answers on deliverables, ISO 19650 workflows, revisions, and fee structures.
Share your site parcel, CAD sketches, or point-cloud survey directly with our founding architects and civil engineers. Receive an itemized LOD deliverables matrix and fixed milestone schedule within 24 hours.