SerMimar® Studio · Est. 2008 · ISO 19650 BIM & Architectural Engineering
SERMIMAR EST. 2008
Masterplan + LOD 400 Modular DfMA 200 – 5,000 Person Camp Village

Modular Workforce Camp & Village Masterplan: IFC/EBRD Specs, DfMA & Fees

Rapid-deployment remote EPC, mining, and energy camp villages engineered to IFC/EBRD welfare standards and 40HC container flat-pack logistics.

Modular light-gauge steel and flat-pack workforce accommodation camp masterplan with canteen and recreation buildings
Camp Masterplan + LGS/Modular DfMA BIM + Containerized STP/RO Utilities + Packing Lists 3 – 5 Weeks
Engineering Specification & Fee Snapshot
IFC / EBRD Workers’ Accommodation · 40HC Flat-Pack / LGS · -40°C to +55°C
BIM Detail Level Masterplan + LOD 400 Modular DfMA
Reference Scale 200 – 5,000 Person Camp Village
Delivery Schedule 3 – 5 Weeks
Indicative Studio Fee $19,500 – $42,000 (for 500–1,500 Person Camp Masterplan + DfMA BIM)
Ref. Construction CAPEX $3.8M – $7.5M Indicative Prefab Camp & Site Utilities Ref.
Native File Outputs Camp Masterplan + Modular LGS/Container CNC BIM + Off-Grid Utilities + Packing List
A B C SITE MASTERPLAN & INFRASTRUCTURE ZONING MATRIX ARCHITECTURAL ENVELOPE (U ≤ 0.24 W/m²K) STRUCTURAL FRAME & SEISMIC NODE (EC8 / TBDY) MEP CORRIDOR — ZERO CLASH ZONE (±3 mm) 5D BoQ & CNC / SHOP DRAWING OUTPUT SERMIMAR STUDIO · ISO 19650 · IFC4 / RVT / DWG

Technical Parameters & Tolerance Matrix

Engineering Parameter Specification Benchmark
Target BIM Level & Governing Norm Masterplan + LOD 400 Modular DfMA · IFC / EBRD Workers’ Accommodation · 40HC Flat-Pack / LGS · -40°C to +55°C
Reference Gross Scale 200 – 5,000 Person Camp Village
Coordinated Disciplines Camp Masterplan + LGS/Modular DfMA BIM + Containerized STP/RO Utilities + Packing Lists
Milestone Delivery Schedule 3 – 5 Weeks
Indicative Studio Fee Band $19,500 – $42,000 (for 500–1,500 Person Camp Masterplan + DfMA BIM)
Native File Deliverables Camp Masterplan + Modular LGS/Container CNC BIM + Off-Grid Utilities + Packing List
SEC 01

Project & Engineering Scope Overview

International EPC contractors, mining operators, and renewable-energy developers financed by World Bank, IFC, or EBRD face strict audits on worker accommodation space, fire separation, hygiene, and extreme climate insulation (-40°C steppe to +55°C desert). SerMimar engineers export-ready camp villages.

Engineered to Masterplan + LOD 400 Modular DfMA precision across a reference benchmark of 200 – 5,000 Person Camp Village under IFC / EBRD Workers’ Accommodation · 40HC Flat-Pack / LGS · -40°C to +55°C, this canonical specification unifies spatial design, multidisciplinary clash resolution, and 5D cost certainty prior to site mobilization.

SEC 02

Architectural Layout, Structural Grid & Spatial Zoning

Structural Grid & Modular Alignment: 2.438 m × 6.058 m / 3.00 m × 6.00 m flat-pack modular dormitories paired with 12 m – 18 m light-gauge steel (LGS) trusses for mess halls and clinics.

Primary column grids, facade mullion subdivisions, and subterranean parking geometry are locked onto a unified datum—eliminating non-standard off-cuts and costly site framing adjustments.

SEC 03

Functional Area Program & Net-to-Gross Floor Plate Optimization

Spatial Program & Net-to-Gross Efficiency: Executive en-suite studios, supervisor twin rooms, workforce dormitories, 1,000-meal industrial kitchen/diner, medical clinic, laundry, mosque/prayer & gym.

Live parametric Revit area schedules track net usable/leasable floor area against vertical cores, MEP plantrooms, and envelope wall thickness at every design iteration.

SEC 04

Circulation Cores, Logistics Access & Life-Safety Egress

Vertical Cores, Logistics & Life-Safety Egress: Firebreak spacing (≥6–10 m between accommodation blocks), shaded/heated arctic walkways, bus embarkation aprons, and perimeter security.

Travel distances, pressurized stair cores, ADA/accessible routing, and heavy service/loading dock swept-path geometry are validated against NFPA, EN, and local building regulations.

SEC 05

Site Utilities, Stormwater Drainage & Wet-Shaft Engineering

Subsurface Utilities, Drainage & Wet Shafts: Containerized plug-and-play Sewage Treatment Plants (MBR STP), brackish/borehole Reverse Osmosis (RO) water skids, and diesel/solar microgrids.

Gravity stormwater and foul drainage stacks are modeled with true 1.5%–2.0% invert slopes, locking structural beam web penetrations and acoustic riser sleeves before rebar detailing.

SEC 06

Plumbing, Fire Suppression (NFPA / EN) & Hydronic Piping BIM

Domestic Plumbing, NFPA/EN Sprinkler & Hydronics: Pre-plumbed bathroom pods, external insulated HDPE heat-traced water loops (for -40°C Central Asia/Nordics), and outdoor fire hydrant rings.

Wet/dry sprinkler grids, fire hose cabinets, booster pump skids, and hydronic manifolds are spatially coordinated above ceiling plenums without compromising architectural clear heights.

SEC 07

HVAC Climatic Routing, Acoustic Control & Zero-Clash MEP

HVAC Routing, Acoustics & Zero-Clash Verification: Sand-trap desert HVAC filtration or high-efficiency heat-pump heating plus commercial kitchen hood make-up air.

Automated Navisworks and Solibri rule-sets enforce ±3 mm hard-clash tolerances and 25–50 mm insulation/maintenance clearance zones, closing 100% of BCF issues prior to tender issue.

SEC 08

Structural Steel / RC Framing & Seismic Performance Analysis

Structural Framing & Seismic Engineering: Relocatable precast plinths or helical screw-pile foundations requiring minimal remote-site concrete batching, plus snow/wind bracing.

Inter-story seismic drift ratios, ductile steel moment/braced connections, foundation punching shear, and secondary facade subframes are signed off by our senior structural engineering partners.

SEC 09

Facade Envelope, Roof Assembly & Hygrothermal U-Value Detailing

Building Envelope & Hygrothermal Physics: 100 mm – 150 mm Class A1 high-density rockwool sandwich walls/roofs delivering fire safety and acoustic sleep quality between night/day shift workers.

2D/3D thermal-bridge condensation risk is audited per EN ISO 6946, pairing Class A1 mineral-wool insulation, vapor-permeable membranes, and slotted seismic facade brackets at 1:5 shop detail scale.

SEC 10

Georeferenced Site Plan & ISO 19650 Common Data Environment (CDE)

Georeferenced Masterplan & ISO 19650 CDE: Every modular panel, LGS frame, window, and MEP kit barcoded per 40ft High-Cube container shipment sequence.

All discipline models share true survey coordinates (UTM / National Grid) and progress through ISO 19650 WIP → Shared → Published gates inside the Common Data Environment.

SEC 11

BIM & Construction Document Deliverables (.RVT / .IFC4 / .NWD / .DWG)

Native BIM & Construction Documentation Package: IFC/EBRD Compliance Masterplan, LOD 400 LGS/Modular CNC Drawings, Foundation Plinth Set, Off-Grid Utility Flowsheets, and 40HC Packing BoQ.

Clients receive unlocked native Camp Masterplan + Modular LGS/Container CNC BIM + Off-Grid Utilities + Packing List source files, plotted PDF/DWG construction sets, and signed zero-clash audit certificates.

SEC 12

5D Quantity Take-Off (BoQ), Studio Fee Band & Cost Benchmarks

5D Quantity Take-Off (BoQ) & Indicative Studio Fee: The indicative engineering & BIM fee band for this reference scope is $19,500 – $42,000 (for 500–1,500 Person Camp Masterplan + DfMA BIM) (with indicative construction CAPEX benchmark at $3.8M – $7.5M Indicative Prefab Camp & Site Utilities Ref.). Designing 6–8 flat-pack dormitory units to nest inside a single 40HC container slashes remote ocean/rail freight costs by up to 65%.

SEC 13

DfMA Prefabrication, 40HC Export Packaging & Execution Pathways

DfMA Prefabrication & Export Execution Pathways: Direct turnkey manufacturing option through SerBuild steel lines and bunk/kitchen equipment consolidation via SerSourcing.

Clients may tender the open BIM package to any local contractor or leverage our integrated group factories (SerBuild steel structures, SerMimar İskele EN 12810 scaffolding, SerMimar Şömine hearths, and SerSourcing 40HC consolidation).

SEC 14

International Building Codes, Green Certification & Grant Readiness

International Codes, Sustainability & Compliance: IFC & EBRD Workers’ Accommodation Processes and Standards, ISO 1496 CSC shipping dimensions, Eurocode 1/3, and NFPA 101.

Structured directly for LEED / BREEAM / RE2020 energy modeling, UK Building Safety Act Golden Thread compliance, Eurocode National Annexes, and institutional lender due diligence.

INTERACTIVE ENGINEERING & FEE ENGINE

BIM, Masterplan & Facade Scope Calculator

Eurocode 8 High-Seismic PGA · GOST/SNiP Alignment
m²
500 m² 10,000 m² 25,000 m² 60,000+ m²
Estimated Studio Engineering Fee Band $44,300 – $57,400 (€40,800 – €52,800)
Estimated Engineering Load 760–970 man-hours
Milestone Delivery Schedule 5–8 weeks
Est. BIM Views & CD Sheets ~72 sheets / models
Indicative Construction CAPEX Ref. $4,640,000 – $7,360,000
Included Native Deliverables
  • LOD 400 Fabrication .RVT/.IFC
  • Facade Thermal & Bracket Calcs
  • 40HC DfMA Assembly & CNC Schedules
  • 5D Master BoQ
Request Detailed Engineering & Cost Study via WhatsApp
CROSS-DISCIPLINE ARCHITECTURE

Explore complementary BIM levels, building typologies, and facade/DfMA specifications.

TECHNICAL & COMMERCIAL Q&A

Frequently Asked Engineering & Commercial Questions

Direct technical answers on deliverables, ISO 19650 workflows, revisions, and fee structures.

What are the mandatory IFC and EBRD worker accommodation standards for lender-backed EPC projects?
IFC/EBRD guidelines enforce minimum net floor area per bed, maximum occupancy per room, sanitary fixture ratios (1 toilet/shower per 6–8 workers or en-suite), acoustic sleep isolation, potable water quality, and fire-rated non-combustible rockwool panels.
How many modular camp m² can be shipped inside a single 40ft High-Cube (40HC) container?
Depending on wall insulation thickness (80–120 mm rockwool), our flat-pack and panelized LGS designs pack roughly 110 m² to 165 m² of complete building shell per 40HC container.
Can these modular camps operate in -40°C Kazakh/Uzbek winters or +52°C Saudi deserts?
Yes. For -40°C steppes we specify 150 mm mineral wool, triple seals,arctic vestibules, and heat-traced buried pipes; for +52°C GCC sites we specify solar reflective double-roof canopies (parasol roofs) and sand-trap desert AC units.
Can the entire camp be dismantled and relocated to a new project site after 3 years?
Yes. Using bolted galvanized frames and precast concrete pad/screw-pile foundations instead of wet cast-in-situ masonry allows 90%+ recovery and relocation across multiple EPC contracts.
Can your group also manufacture and ship the camp buildings and industrial kitchen equipment?
Yes. Once you approve the SerMimar LOD 400 DfMA package, SerBuild manufactures the modular/LGS structures and SerSourcing consolidates industrial kitchens, laundry, and bunks from Türkiye.
SECTION 16 · DIRECT ENGINEERING PROPOSAL & WHATSAPP DESK

Request a Scoped BIM, Masterplan or Facade Engineering Proposal

Share your site parcel, CAD sketches, or point-cloud survey directly with our founding architects and civil engineers. Receive an itemized LOD deliverables matrix and fixed milestone schedule within 24 hours.