ISO 19650 BIM Execution Plan (BEP) & CDE Governance: Standards, Scope & Fees

End-to-end BIM Information Management establishing airtight EIRs, Master Information Delivery Plans (MIDP), naming conventions, and COBie asset schemas.

ISO 19650 BIM Execution Plan governance desk reviewing Master Information Delivery Plans and CDE containers
All Project Stakeholders (Lead Appointed Party Role) 1 – 3 Weeks Setup + Ongoing Gate Audits
Engineering Specification & Fee Snapshot
BS EN ISO 19650-1/2/3/5 · UK BIM Framework · COBie
BIM Detail Level ISO 19650 EIR / BEP
Reference Scale 10,000 – 250,000+ m²
Delivery Schedule 1 – 3 Weeks Setup + Ongoing Gate Audits
Indicative Studio Fee $6,500 – $18,500 (Governance & Setup Package)
Ref. Construction CAPEX Multi-Building / Institutional Portfolio Governance
Native File Outputs EIR · Pre/Post-Contract BEP · MIDP/TIDP · CDE Templates
A B C GRID A-01 / LOD 400 FEDERATED SECTION ARCHITECTURAL ENVELOPE (U ≤ 0.24 W/m²K) STRUCTURAL FRAME & SEISMIC NODE (EC8 / TBDY) MEP CORRIDOR — ZERO CLASH ZONE (±3 mm) 5D BoQ & CNC / SHOP DRAWING OUTPUT SERMIMAR STUDIO · ISO 19650 · IFC4 / RVT / DWG

Technical Parameters & Tolerance Matrix

Engineering Parameter Specification Benchmark
Target BIM Level & Governing Norm ISO 19650 EIR / BEP · BS EN ISO 19650-1/2/3/5 · UK BIM Framework · COBie
Reference Gross Scale 10,000 – 250,000+ m²
Coordinated Disciplines All Project Stakeholders (Lead Appointed Party Role)
Milestone Delivery Schedule 1 – 3 Weeks Setup + Ongoing Gate Audits
Indicative Studio Fee Band $6,500 – $18,500 (Governance & Setup Package)
Native File Deliverables EIR · Pre/Post-Contract BEP · MIDP/TIDP · CDE Templates
SEC 01

Project & Engineering Scope Overview

Multi-million-dollar developments fail digitally when ten consultants model with incompatible origins, rogue family parameters, and chaotic file names. SerMimar acts as your ISO 19650 Information Manager—authoring enforceable EIRs, BEPs, and automated Solibri/Revit validation rules.

Engineered to ISO 19650 EIR / BEP precision across a reference benchmark of 10,000 – 250,000+ m² under BS EN ISO 19650-1/2/3/5 · UK BIM Framework · COBie, this canonical specification unifies spatial design, multidisciplinary clash resolution, and 5D cost certainty prior to site mobilization.

SEC 02

Architectural Layout, Structural Grid & Spatial Zoning

Structural Grid & Modular Alignment: Master Project Base Point, Survey Point, True North rotation, and multi-building zone/volume breakdown strategy.

Primary column grids, facade mullion subdivisions, and subterranean parking geometry are locked onto a unified datum—eliminating non-standard off-cuts and costly site framing adjustments.

SEC 03

Functional Area Program & Net-to-Gross Floor Plate Optimization

Spatial Program & Net-to-Gross Efficiency: Level of Information Need (LOIN) matrices defining exact geometric and alphanumeric parameters required at each project stage.

Live parametric Revit area schedules track net usable/leasable floor area against vertical cores, MEP plantrooms, and envelope wall thickness at every design iteration.

SEC 04

Circulation Cores, Logistics Access & Life-Safety Egress

Vertical Cores, Logistics & Life-Safety Egress: Uniclass 2015 / OmniClass spatial and room numbering schemas mapped seamlessly to facility management CAFM systems.

Travel distances, pressurized stair cores, ADA/accessible routing, and heavy service/loading dock swept-path geometry are validated against NFPA, EN, and local building regulations.

SEC 05

Site Utilities, Stormwater Drainage & Wet-Shaft Engineering

Subsurface Utilities, Drainage & Wet Shafts: Standardized system classification codes across civil utilities, drainage networks, and district energy corridors.

Gravity stormwater and foul drainage stacks are modeled with true 1.5%–2.0% invert slopes, locking structural beam web penetrations and acoustic riser sleeves before rebar detailing.

SEC 06

Plumbing, Fire Suppression (NFPA / EN) & Hydronic Piping BIM

Domestic Plumbing, NFPA/EN Sprinkler & Hydronics: Golden Thread fire-safety asset tagging (fire doors, dampers, suppression valves) per ISO 19650-5 & UK Building Safety Act.

Wet/dry sprinkler grids, fire hose cabinets, booster pump skids, and hydronic manifolds are spatially coordinated above ceiling plenums without compromising architectural clear heights.

SEC 07

HVAC Climatic Routing, Acoustic Control & Zero-Clash MEP

HVAC Routing, Acoustics & Zero-Clash Verification: Automated model-health & clash gate checklists enforced before any consultant container transitions from WIP to Shared.

Automated Navisworks and Solibri rule-sets enforce ±3 mm hard-clash tolerances and 25–50 mm insulation/maintenance clearance zones, closing 100% of BCF issues prior to tender issue.

SEC 08

Structural Steel / RC Framing & Seismic Performance Analysis

Structural Framing & Seismic Engineering: Material grade, carbon-factor (embodied carbon kgCO2e), and structural load-bearing IFC property set mapping.

Inter-story seismic drift ratios, ductile steel moment/braced connections, foundation punching shear, and secondary facade subframes are signed off by our senior structural engineering partners.

SEC 09

Facade Envelope, Roof Assembly & Hygrothermal U-Value Detailing

Building Envelope & Hygrothermal Physics: Thermal transmittance, acoustic rating, solar heat gain (g-value), and warranty metadata embedded into curtain-wall families.

2D/3D thermal-bridge condensation risk is audited per EN ISO 6946, pairing Class A1 mineral-wool insulation, vapor-permeable membranes, and slotted seismic facade brackets at 1:5 shop detail scale.

SEC 10

Georeferenced Site Plan & ISO 19650 Common Data Environment (CDE)

Georeferenced Masterplan & ISO 19650 CDE: Turnkey configuration of Autodesk Construction Cloud (ACC), Trimble Connect, or Dalux permissions, naming syntax, and status suitability codes (S0–S4, A1–An).

All discipline models share true survey coordinates (UTM / National Grid) and progress through ISO 19650 WIP → Shared → Published gates inside the Common Data Environment.

SEC 11

BIM & Construction Document Deliverables (.RVT / .IFC4 / .NWD / .DWG)

Native BIM & Construction Documentation Package: OIR/AIR/EIR documents, Pre & Post-Appointment BEP, Responsibility Matrix, MIDP/TIDP trackers, Revit template (.RTE), and Shared Parameter file.

Clients receive unlocked native EIR · Pre/Post-Contract BEP · MIDP/TIDP · CDE Templates source files, plotted PDF/DWG construction sets, and signed zero-clash audit certificates.

SEC 12

5D Quantity Take-Off (BoQ), Studio Fee Band & Cost Benchmarks

5D Quantity Take-Off (BoQ) & Indicative Studio Fee: The indicative engineering & BIM fee band for this reference scope is $6,500 – $18,500 (Governance & Setup Package) (with indicative construction CAPEX benchmark at Multi-Building / Institutional Portfolio Governance). Prevents costly mid-project remodeling and guarantees tender bidders price identical, auditable 5D data structures.

SEC 13

DfMA Prefabrication, 40HC Export Packaging & Execution Pathways

DfMA Prefabrication & Export Execution Pathways: Embeds fabrication work-package IDs, container batch codes, and erection sequence parameters into the master BIM schema.

Clients may tender the open BIM package to any local contractor or leverage our integrated group factories (SerBuild steel structures, SerMimar İskele EN 12810 scaffolding, SerMimar Şömine hearths, and SerSourcing 40HC consolidation).

SEC 14

International Building Codes, Green Certification & Grant Readiness

International Codes, Sustainability & Compliance: 100% aligned with BS EN ISO 19650 Parts 1, 2, 3 & 5, UK BIM Framework, and public-sector digital procurement mandates.

Structured directly for LEED / BREEAM / RE2020 energy modeling, UK Building Safety Act Golden Thread compliance, Eurocode National Annexes, and institutional lender due diligence.

INTERACTIVE ENGINEERING & FEE ENGINE

BIM, Masterplan & Facade Scope Calculator

UK ISO 19650 · RIBA Stages 2–5 · Part B/L
m²
500 m² 10,000 m² 25,000 m² 60,000+ m²
Estimated Studio Engineering Fee Band $131,400 – $170,200 (€120,900 – €156,600)
Estimated Engineering Load 2065–2635 man-hours
Milestone Delivery Schedule 13–22 weeks
Est. BIM Views & CD Sheets ~202 sheets / models
Indicative Construction CAPEX Ref. $24,000,000 – $37,000,000
Included Native Deliverables
  • Federated .RVT / .NWD
  • BCF Clash-Free Audit Report
  • 5D Itemized BoQ (.XLSX)
  • Full CD .DWG Set
Request Detailed Engineering & Cost Study via WhatsApp
CROSS-DISCIPLINE ARCHITECTURE

Explore complementary BIM levels, building typologies, and facade/DfMA specifications.

TECHNICAL & COMMERCIAL Q&A

Frequently Asked Engineering & Commercial Questions

Direct technical answers on deliverables, ISO 19650 workflows, revisions, and fee structures.

Should an investor commission an EIR before hiring design architects and engineers?
Yes. Issuing a crisp ISO 19650 Exchange Information Requirements (EIR) document inside your tender ensures every appointed consultant is contractually bound to the same LOD, IFC, and COBie deliverables without surprise variation claims.
Do you provide custom Revit Templates (.RTE) and Shared Parameter files for our organization?
Yes. We build bespoke corporate .RTE templates, titleblocks, view templates, and IFC mapping tables tailored to your developer or contractor standards.
What is LOIN (Level of Information Need) in ISO 19650 compared to traditional LOD?
While traditional LOD uses coarse numbers (300/400), ISO 19650 LOIN defines exact geometrical detail, dimensionality, location, appearance, and alphanumeric metadata per asset type and milestone purpose.
Can you audit models submitted by our contractors at each payment milestone?
Yes. Many institutional developers retain SerMimar to run independent stage-gate audits—verifying model compliance, zero-clash status, and COBie completeness before approving consultant milestone invoices.
How quickly can you set up an ISO 19650 BEP and ACC Common Data Environment?
Complete BEP authoring, naming convention setup, Revit template configuration, and CDE folder/workflow deployment takes 7 to 15 business days.
SECTION 16 · DIRECT ENGINEERING PROPOSAL & WHATSAPP DESK

Request a Scoped BIM, Masterplan or Facade Engineering Proposal

Share your site parcel, CAD sketches, or point-cloud survey directly with our founding architects and civil engineers. Receive an itemized LOD deliverables matrix and fixed milestone schedule within 24 hours.